Student Web links:
Note if a student website is not turned in by 2-14-2017 and completed by 2-20-2017 no credit will be given for this assignment. The site MUST meet all Criteria and Constraints. If it does not it will be considered incomplete and not posted.
http://All Student Links must be added by no later than 10-7-2017 to be considered for a grade. If not added by the deadline, all sections of the project may receive a zero grade. Group 1 Group 2 Group 3 Group 4 Group 5 Group 6 Group 7 |
|
Project - Criteria and Constraints
Criteria
- Student groups must consider at least 4 different problems or solutions with at least 3 valid sources of research with citation written on research page of website.
- Teams will complete a Daily Debriefing Sheet which will be kept in their team folder.
- Teams will complete a Engineering Design Process Team Sheet for each step before being allowed to move on to the next design step.
- Teams will create a website that will be edited/shared with all members of the team.
- The website must include the following pages
- The Problem: description of the problem being solved (CEO)
- The Product: description of product including why it was created, and multiple views of a model of the product in an orthographic drawing and a image of a 3D prototype built to scale and any other requirements of Kickstarter(SE)
- Materials and Projected Budget: description of materials used with reason for use, including projected costs and amount of materials needed (CFO) Must fill out proper materials request form.
- Why Our Product: explain why an evaluator should invest in your product teams in a website presentation and may include a short video presentation of the product made (COO)
Additional Information: Include a page that will give the audience additional information like interesting facts related to your product or solution, webpage links, related videos, etc. (CEO) - Research page with sources and citation should be included as a web page
Constraints
- TIME- daily and weekly deadlines must be met or students will need to work outside of class time
- Material must be listed on a Material List sheet before ordering. Any material added after October 27 must be brought in by teams.
- All items of the criteria must be met before the students may upload their web site
- All written documentation must be turned in at time of presentation:EDP Documentation Sheets Click Here
Daily Review Sheets Click Here
Material List Rubric Click Here
Project Rubric Cick Here